I ordered a new F150 XL on February 15th 2024 paid $500 down good faith money. I was told I would have it in two or three months. I didn't hear anything from Ford until the end of August telling me that it would be put into production on September 9th. A few days later the date was changed to September the 16th and then a few days later it was changed to October the 24th. I don't think Ford really wants to build this truck as it is an XL with only one upgrade, a chrome package. I don't understand how it could take so long to build this truck. I have talked to the Ford Reps and it hasn't done any good. I would love to buy one off the lot and have spent a lot of time lookin on my computer, but haven't found anything. Most of the in stock trucks are fully loaded extended or crew cabs and I want a RCSB truck. By the time it is built, shipped and delivered it will be 9 or 10 months which seems ridiculous. Ram doesn't make a short bed standard cab and Chevrolet's only comes with the 4 cylinder. Anyone ever had this problem?