Originally Posted By: Panzerman
I have to ask how did they even pick-up to load it and how will they unload it. Something that heavy you wold think they would build on site. Incredible.
Most of that really heavy stuff is jacked around. Jacks under it to lift it etc.
Got to a power station or a switchyard, and the transformer "runway" has usually got rails embedded in the (immensely thick) concrete. At "intersections", there is a crucific piece that gets picked up, rotated through 90 degrees and thus changes direction.
When a tranny needs to be moved, it's jacked up, wheels put under it, wheeled to the slot it needs to go to, then jacked again, the wheels and the crucific rotated, and then pushed to position...jacked up again, and left with it's service supports underneath it.