Originally Posted By: AirgunSavant
Thanks Hatt and bubbatime.. !
I will be able to build the houses better and more cost effective.
The reason being is I will not have a building loan and my fiancée is a Florida
real-estate agent and she covers that area so unlike other builders I have eliminated carrying cost.
I also did note that this was going to be my hobby- not an investment. That is the key.
These houses will be custom after the first one. Also my first build is on 12 acres- that subdivision has a minimum 2800 sq ft living space requirement. That subdivision has 29 lots and no they are not the 1/4 acre type but from 10-24 acres each. It only has 5 houses on it now and the last one just sold for nearly $700K. Not new but just a few months ago and it was not built to a standard I would call great.
I have two lots there now myself.
This house is nearing completion and this is next to my 12 acre lot. I believe they have 11 acres.
This house has taken about 7 months to build. It is quality. I don't know the cost to build this
but I'm sure it was well over $500K.
What's with the different pitch of the roof line on the front bump outs? If you are going to use a different pitch, make it a dramatic change, not just a few degrees which makes it look like someone goofed up on installing the correct pitch.
Just my .02...
Thanks Hatt and bubbatime.. !
I will be able to build the houses better and more cost effective.
The reason being is I will not have a building loan and my fiancée is a Florida
real-estate agent and she covers that area so unlike other builders I have eliminated carrying cost.
I also did note that this was going to be my hobby- not an investment. That is the key.
These houses will be custom after the first one. Also my first build is on 12 acres- that subdivision has a minimum 2800 sq ft living space requirement. That subdivision has 29 lots and no they are not the 1/4 acre type but from 10-24 acres each. It only has 5 houses on it now and the last one just sold for nearly $700K. Not new but just a few months ago and it was not built to a standard I would call great.
I have two lots there now myself.
This house is nearing completion and this is next to my 12 acre lot. I believe they have 11 acres.
This house has taken about 7 months to build. It is quality. I don't know the cost to build this
but I'm sure it was well over $500K.
What's with the different pitch of the roof line on the front bump outs? If you are going to use a different pitch, make it a dramatic change, not just a few degrees which makes it look like someone goofed up on installing the correct pitch.
Just my .02...