Finished most of the welding repairs on the main cage of the Yerf Dog go kart, the entire front pipe was basically gone but I was able to salvage and rebuild it with some scrap I have on hand. The front suspension rebuild is next. A spindle needs to be bent back into shape then reinforced. The rear needs welding too for a Predator engine instead of the GY6, reversing the axle, moving the brake caliper bracket to the other side. I love welding even thought I'm not great at it. Many more welding projects in the queue.
View attachment 284869View attachment 284867
The cage welding repairs are finished, there was a back square tube that needed replaced.
The front suspension is coming along. New ball joints pressed in, the driver front spindle pressed back into shape. Need to reinforce the spindles with more gussets, many complaints of other owners with the the same issue.