Decided today that it was time to dig into this mess. Deck sticks off the house 12' and is 16' long. It uses four pilings on the 16' side. One corner rises in the winter, and too bad, the piling doing the pushing is not on the corner, it is one piling in. The corner that lifts snapped the piling under it, about 18 inches down.
I started digging today, and gap in broken piling is more than an inch. I'm guessing I need to pull both pilings out, level the deck, and then I can put in new sonotubes? I'm a little murky on this, trying to tackle this on my own but I suspect I really need a pro to do this.