We're in the final stages of putting a new roof on our house. The job has included extending the eaves, insulating and redecking in some places. H-clips were used in some areas originally with the sheathing and were specified for use in the new work.
I think, though, that the H-clips were not actually installed with the new decking. I found a big unopened box of them among left over material, and I don't remember seeing them used when they were redoing the decking. (I was up on the roof several times during the day when most of the redecking was being done, but I was following other aspects of the work and didn't think about the clips).
I'm not sure how to address this lack of clips with the company. I don't think that it necessitates redoing everything, but I can imagine that leaving out the clips might affect the structural integrity of the job somewhat.
I think, though, that the H-clips were not actually installed with the new decking. I found a big unopened box of them among left over material, and I don't remember seeing them used when they were redoing the decking. (I was up on the roof several times during the day when most of the redecking was being done, but I was following other aspects of the work and didn't think about the clips).
I'm not sure how to address this lack of clips with the company. I don't think that it necessitates redoing everything, but I can imagine that leaving out the clips might affect the structural integrity of the job somewhat.