My motorhome has a Genrac Q-55G generator with the Generac GN480 engine (only 97 hours on it). It's a 2 cylinder V engine on it's side and I think is about 15 hp. Anyway, I figure I might as well run Redline since it takes heat better and it won't be that costly because the generator only holds maybe a half quart to a quart IIRC. Is 100 hours enough time to switch to Redline or should I run dino for another 50 hrs first?